Skip to main content
 
 
Plan Spec
Alpharetta, GA

At this school, the Shumate team installed equipment that included exhaust fans, an Evapco cooling tower, 45 Trane water source heat pumps, 2 Addison energy recovery units and 4 Taco condenser, loop water & boiler pumps. The school also has a DDC system that gives staff a way to manage the HVAC equipment.